We are currently constructing the playing fields which includes 7
new tennis courts, 3 full basketball courts, a full pitch soccer
field with football, baseball field, softball field and 2 volleyball
courts with sand. So far we have installed the new tennis courts and
the basketball courts. Below are the latest images of the general
progress so far.
 |
| New tennis court near the prayer hall.
Awaiting new searler and colors. |
|
 |
| Newly renovated prayer hall and a small soccer
field for kids next to it. |
|
 |
| Prayer hall on a beautiful day. |
|
 |
| Newly updated dining hall with new decks to
handle more visitors. |
|
 |
| Newly updated lodge house with a new roof and
updated wood floors. |
|
 |
|
 |
| Boy's soccer field being carefully
graded with a D4C dozer. |
|
 |
| Boy's soccer field being graded (zoomed
out) |
|
 |
| New boy's tennis courts (3). Awaiting
fence, surface and net posts. |
|
 |
| New boy's baseball and softball field. |
|
 |
| Boy's baseball field being prepared with an
excavator. |
|
 |
| New boy's basketball courts (north view) |
|
 |
| New boy's basketball courts (north view) |
|
 |
| New boy's basketball courts (2) next to the
soccer field (south view) |
|
 |
| New girl's basketball court with 3 new
tennis courts |
|
 |
| New girl's basketball court with a
volleyball court (to be installed) next to it |
|
 |
| Swim area with a dock and sandy beach. |
|
 |
| Newly widened bridge with new steel beam
supports and white oak deck. |
|
 |
| New gate entrance between the playing
fields. |
|
 |
| Freshly graded area for the new bonfire. |
|
 |
| Graded lakefront area pending landscaping. |
|
 |
| Lakefront area near the boy's section
awaiting final touches. |
|
 |
| Repositioned stairs from main area towards
the lake.. |
|
 |
| Picnic area with stone barbecue pit |
|
 |
|
 |
|
 |
|